SeamTrailSeamTrail

Drift

When a doc section or a decision changes, SeamTrail flags the tickets and pull requests that now need an update.

Drift is work that needs an update after a change.

Example: the spec said "refunds within 7 days". Someone edits it to "3 days". The ticket built for 7 days, and its open pull request, now need an update. SeamTrail flags them.

What starts a drift check

  1. A doc section changes. Someone edits a section of a linked Confluence page, or a frame on a linked Miro board.
  2. A decision is made, anywhere. In a Slack message, a Jira description or comment, a meeting summary, a pull request comment, or an AI assistant's note.

A decision counts when it changes what a doc section says, or names the tickets it affects.

How SeamTrail checks

  1. Did the meaning change? Two separate AI checks look at the edit, and both must agree that the meaning changed. A typo fix or a reworded sentence stops here. Nothing is flagged.
  2. What was built on it? SeamTrail looks at the tickets linked to that section: their descriptions, comments, status and where their code is. It also looks at their pull requests (a pull request closed without merging is left out), the commits that name those tickets, and the project's chat messages from the last 90 days that may still tell people the old way.
  3. What needs an update? For a decision, a fast AI check first sets aside the linked items it is very sure the decision does not touch. A second AI then reads the rest. Each affected item says, in plain words, what it still says that is now wrong, and how to fix it.

When a decision changes what a doc says, the doc section itself can be flagged too.

A decision written by an AI assistant also starts a check. It is marked unconfirmed until a person confirms it. On its cards, Confirm keeps the decision as that person's word and the cards stay; It's wrong closes every card of that change, and the button says how many.

Where you see it

PlaceWhat you get
The Drift slide in the box on the project page and a team's folder (See all for every change), and the Drift tab in a folder or a stage without the boxOne short row per change: the change, the items that need an update as small tags, and one Review.
A ticket's brief (the ⓘ on a ticket)The open drift on that ticket.
Your AI assistantOpen drift is part of the project's status and context. The drift on your own tickets is listed for you.
The SeamTrail chatAnswers name open drift when it matters.

One row per change. The Drift slide, See all and the Drift tab show one row for each change, however many things need an update because of it. The list is for finding a change. Reading it is what Review is for. A row shows:

  • The change, in one sentence.
  • The items that need an update, as small tags. A task or a pull request shows its key, like DEMO-7. A doc part or a chat message shows its name. A tag with a dashed border is an item SeamTrail is not sure of.
  • The teams those items belong to, in a project's box and its See all.
  • How old the change is, like 24h or 22d.
  • One Review.

For example: you change the password expiry in a spec from 30 days to 90 days. One row says that, with three tags: the two tasks and the doc part that still say 30 days.

Review opens the change on one screen, with every item that needs an update. A tag opens the same screen with that item marked. ‹ › step to the change before or after. What an item still says, who decided the change and where, and every button are in Review.

The Drift count is the number of changes, so "Drift 3" means three changes to look at, however many items each one has. A tag goes away when its item is fixed or handled. The row goes away with its last tag, and only then does the count go down. A change that SeamTrail is still checking is one row that says "Checking what it touches". SeamTrail may check one change more than once (a decision is checked once for each doc part it touches); the checks of one change are shown together as one row.

See all lists every change, however old, with all of its tags. The Drift slide in the box shows the first three changes, or two on a phone. A change with many items shows its first tags there and + N for the rest. The list scrolls; Show history adds the closed items, one card each, with how each was closed. In Review, See all goes back to the list. The Drift tab in a folder or a stage shows the same rows, only with the tags of its own things, and Review opens the change in a popup.

A change in Review

Review shows one change on one screen, in plain words:

  • The change, in one sentence. Under it: who decided or edited it, when, where (a link to the ticket, the chat message or the page), and why when SeamTrail knows it.
  • Needs update: every item that needs an update because of the change, with a count. Tasks, pull requests, doc parts and chat messages are listed together, and so is the code of a task when it still does the old thing. A kind of item the change did not touch is not shown. Each item is a link and shows:
    • what it still says, and the clash in a few words, like "30 days vs 90 days";
    • Suggestion: what SeamTrail suggests for that item;
    • where it stands ("Code is on prod", "Not started") and who has it;
    • Open in Jira (or GitHub, Confluence, Notion, Slack…);
    • More: what you can do with that one item alone, like Not related, which also unlinks it so it never warns again.
    • Not sure marks an item that may not be affected. More lets you confirm it or mark it not related.
  • What you can do, for the whole change:
    • Do all N suggestions (Do my suggestion when there is one) shows every change before it happens. For a ticket you pick how: Change the description (the sentence now, struck out, and the new one), Add at the end, or Add a comment. A ticket whose shipped code must change also offers Make a new ticket for the code. Untick what you don't want and change any words, then Make N changes. A chat message gets a drafted reply to copy: SeamTrail cannot write in the chat for you yet.
    • Change them first opens the same list with every text ready to edit.
    • Not a problem: nothing needs fixing.
    • Already resolved: someone fixed it already. The history says "already resolved by" that person.
    • Not a problem and Already resolved close every item of the change, and the screen says how many that is.
    • Ask the agent about this opens Ask SeamTrail with a first question written for you. Nothing is sent until you send it.

When an AI assistant wrote the decision, the warning first asks "An assistant wrote this decision for you. Is it right?" Confirm keeps it, It's wrong closes it.

  • Nothing changes until you press a button. After it runs, each change says what it did, or why it could not, with Undo.
  • Show history shows closed warnings, folded. Click one to open it.
  • On a phone the parts stack, and the buttons are full width.

A warning on a ticket closes by itself, as handled, when that ticket moves to Done after the warning was raised: "handled by SeamTrail — SEAM-70 moved to Done on 7 Oct". A ticket that was already Done when the warning came keeps it open — finished work that a later decision changes is what drift is for.

A warning on a ticket also closes by itself when you fix the ticket by hand in its own tool, Jira or Notion. Change its title or its description so it no longer says the old thing. SeamTrail then reads the ticket as it is now and closes the warning only when it is sure: "handled by SeamTrail — DEMO-3 was changed on 16 Nov and no longer says "Reset link valid for 30 minutes"".

The warning stays open when:

  • the words it quotes are still in the ticket. For example, the title is new but the description still says the old value;
  • the ticket says the old thing in other words ("half an hour" for "30 minutes"), keeps it for some people, or says a third value;
  • SeamTrail is not sure. Then press Mark handled yourself.

Who is told

The people who own the affected tickets see the drift in their own view: in SeamTrail, and in their AI assistant's context.

Drift is shown, not sent. SeamTrail does not post drift to Slack channels or to pull requests, and it writes nothing into Jira.

What drift needs

When a doc section changes, drift reaches a ticket through the link between that ticket and the section. A ticket with no link to the section is missed. SeamTrail makes most of these links by itself. See Links.

A decision also checks the tickets it names, even without a link.

SeamTrail does not read your code. It flags the linked pull requests. Your coding assistant can read the code.

How fast

  • Chat, tickets and code: as soon as the tool sends the change.
  • Confluence: SeamTrail checks linked pages for changes every few minutes. Click Update memory on a project to read its docs right away.
  • Google Docs and Notion: the same. Linked pages are checked every few minutes, and a Notion page is also read as soon as Notion says it changed.

Coming soon

  • Drift from edits in Figma designs.
  • Decisions in meeting transcripts, GitHub code-line comments and Bitbucket pull request comments.

On this page